Disclaimer
House & Land Package Disclaimer
Pictures are for illustration purposes only. Photos and images are intended to be a visual aid only and may show features or items which do not form part of the home design. Please speak with a Design & Building Consultant for further details.
The details contained in any home and land package displayed on the WA Country Builders web site were correct at the time of listing, however pricing and land availability are subject to change.
All care has been taken to ensure the home design shown is suitable for the advertised lot however design and specification are subject to shire and developer approvals. Prices specified may vary and be subject to change once all site works plans are completed other relevant costs are taken into consideration.
Changes made to the design may affect the total cost of the package. Photos, images and descriptions are intended to be a visual aid only and may show items or inclusions which do not form part of the land or house and land package
Land Prices
Pricing and availability are correct at the time of listing, WA Country Builders does not own the lot and the owner of the lot reserves the right to alter the prices.
Prices do not include stamp duty, registration fees and any other fees or charges relating to the purchase of land. Purchasers will need to pay these fees and charges separately. The price is subject to adjustments under the land contract, including rates and land tax.
Purchasers will need to enter into a sales contract with a representative operating under the guidance and control of a real estate agent on behalf of the owner of the land and a separate contract with WA Country Builders for the construction of the house.
House Prices
The price shown is based on WA Country Builders standard specifications and the inclusions for the house as nominated by WA Country Builders. The price may be subject to exclusions such as site establishment costs, landscaping, fencing and any other identified exclusions.
Alterations may be required to an advertised house to ensure it is compatible with a site specific analysis which includes, but is not limited to, a site survey and a soil classification report. Further site specific requirements may include State or Local Government requirements and developer covenants applying to the land. These alterations may increase the cost of construction.
Social Media and Moderation
WA Country Builders welcome visitors to our social media channels or public review websites where they may post comments, reviews and photos and submit questions or ideas. We encourage discussions and engagement and accept constructive suggestions and critique so long as posts are relevant and respectful to our staff, customers, suppliers and wider social community.
WA Country Builders will, as far as possible, report and/or remove content posted to our social media channels or public review websites should it be the opinion of WA Country Builders that they may be reasonably interpreted to be illegal, threatening, defamatory, contain obscene language or racism or be invasive to the privacy of any WA Country Builders staff member, agent, representative or customer. WA Country Builders reserve the right to remove posts which contravene these guidelines including those considered to constitute excessive posting, spamming or commercial solicitation and may block the accounts of those users that post comments of the above nature in a persistent or extreme manner, to avoid any future posts of a similar nature.
With the exception of material posted on embedded third party websites, WA Country Builders own or have the rights to the intellectual property in the material that we post. The work is copyright. You may download, display, print and reproduce this material in unaltered form only (retaining this notice) for your personal, non-commercial use or use within your organisation.
You do not have any rights to the material posted by other people on various social media channels and must not copy, reproduce or adapt this material unless the owner of that material expressly gives you these rights.
Privacy
WA Country Builders take all reasonable steps to keep secure any personal information that we hold about you, and to keep this information accurate and up to date. You can access the information we hold about you by contacting us.
WA Country Builders abides by applicable Australian privacy legislation. We may disclose your personal information to any organisation involved with providing credit to you, or any other associates or contractors of WA Country Builders, including but not limited to affiliate business partners, builders, architects, printing houses, mail houses, lawyers or accountants.
We may use your personal information for direct marketing of products and other services offered by WA Country Builders, or an organisation we are affiliated with or represent. You have the right to request not to receive direct marketing material.
We may also collect personal information through:
- “Cookies”, “IP addresses” and “session tokens”. We use software on our website and servers called cookies and session tokens, which store information and enables our website to recognise individuals’ web browsers and remember certain information to assist individuals’ future use of our website. Your IP address may also be stored as an additional security measure and may be used to identify you; and
- Recording information individuals give us, e.g. if we record telephone conversations with individuals for training and monitoring purposes (we will only do this with individuals’ consent when they call us, and individuals will have the option to ‘opt out’ of recording).
Copyright: All content included on this site, including text, graphics, logos, icons, images, and software as well as the compilation of the content is the property of WA Country Builders or its affiliates and suppliers and protected by Australian copyright laws.
You may view this site and its content using your web-browser and save an electronic copy or print out a copy solely for your own information, research or study provided you do not modify the copy from how it appears on the site. Any other use, including the reproduction, modification, distribution, display or transmission of the site is strictly prohibited.
Trade Marks: WA Country Builders has the exclusive right to use the marks WA Country Builders. All other marks, product names and company names appearing on this site are the property of their respective owners.
Use of Site: This site or any portion of this site may not be reproduced, duplicated, sold, resold or otherwise exploited for any commercial purpose that is not expressly permitted by WA Country Builders.
WA Country Builders endeavours to provide a reliable, high quality site. However service interruptions or unauthorised conduct may occur due to factors beyond the control of WA Country Builders. No representations or warranties are made as to the provisions of uninterrupted service. WA Country Builders is not liable whatsoever for any unauthorised acts or conduct.
No representations or warranties are made as to the accuracy of information or material contained on this site. You should satisfy yourself as to the accuracy of such material through independent enquiries.
WA Country Builders and its affiliates reserve the right to refuse service, terminate accounts, and/or cancel lodged documents in its discretion, including, without limitation, if your conduct violates applicable law or is harmful to the interests of WA Country Builders and its affiliates.
We reserve the right to make changes to our site and these disclaimers, terms and conditions at any time without notice.
Be Vigilant Against Cyberfraud
Hackers have impersonated Building Companies and requested payment via email using false account details. It is important you ensure that any transfers are made to verified bank account details – and if those details have changed, that you call us on our published phone number to verify them.
Defamation: Any opinions expressed on this site are personal opinions only and are not the view of WA Country Builders. WA Country Builders will not be bound, by, nor liable for any information or material contained on this site which may be defamatory.
Applicable Law: This site and these disclaimers and terms and conditions are governed by the laws of the State of Western Australia and Australian Privacy Principles (‘APPs’) of the Privacy Act 1988 (Cth) (Privacy Act) . This site may be accessed outside Australia however you do so on your own responsibility and are responsible for ensuring compliance with all laws in the place where you are located. WA Country Builders makes no representations or warranties that the content of this site complies with the laws of any country outside Australia.
Disclaimer: this site is provided by WA Country Builders on an ‘as is’ basis. WA Country Builders makes no representations or warranties of any kind, express or implied, as to the operation of the site or the information, content, materials, or products/services included on this site. To the fullest extent permissible by applicable law, WA Country Builders disclaims all warranties, express or implied, including, but not limited to, implied warranties of merchantability and fitness for a particular purpose. WA Country Builders will not be liable for any damages of any kind arising from the use of this site, including, but not limited to direct, indirect, incidental, punitive, and consequential damages. No links or frames connecting this site with another website are endorsements, recommendations or representations regarding those websites.
Peace of mind Guarantees
Terms and conditions apply to each Guarantee and differ in each region. Speak with a Design Consultant for details.
Live Large
Within the terms and conditions contained in this document, the Live Large Promotion provide one of two options;
- To double the area size of the alfresco shown on any of our standard models (excluding any designs containing raked alfresco ceilings), or
- Add a third garage immediately adjoining the side of an existing garage on any of our standard models.
The Promotion is available to new customers who sign their Preparation of Plans Agreement on or after 1st January 2024 and before the 30th April 2024. The Promotion is not available in conjunction with any other promotion, competition, discount, or incentive. WA Country Builders (WACB) reserves the right to amend, cancel or extend this Promotion at any time without notice.
Applicable to WA Country Builders single storey standard house models (outside of those excluded) only. Any changes to these standard models may void this promotion or incur additional costs.
By the addition of either option contained in this promotion, the select standard house plan may no longer suit the block size or width advertised by WA Country Builders from time to time. Clients are to undertake their own due diligence on the suitability of adding this promotion to a selected house plan to suit their own situation. The addition of either option in this promotion will not be permitted where the addition would prevent the home meeting requirements for the issue of a building permit.
Promotion inclusions are not transferrable to any other discount, credit or offset against any other variations without the explicit permission of WACB management.
Further detailed information regarding specifications, minimum/maximum dimensions, setbacks, materials and construction detail and other specific plan details are provided on the Live Large Promotional Annexure and is available on request from your New Homes Consultant.
The Express Series – Build Time Guarantee
Our Express Series Promotion Build Time Guarantee offers you peace of mind knowing WA Country Builders (‘The Builder’) will have your Express Series Promotion home completed to Practical Completion in 18 calendar months from receipt of the Slab Down payment, subject to these terms and conditions being met.
Should all terms and conditions be met, and The Builder has not reached Practical Completion within the guaranteed time, The Builder will pay The Client $500 per week for a maximum of 16 weeks for every full week over the guaranteed date.
Terms and Conditions
- No owner supplied items or works are permitted as part of the building contract.
- Is only applicable to the standard home designs identified in The Builder’s Express Series Promotion. Changes to the standard designs are not permitted without explicit written approval by The Builder and noted on the quotation.
- The Client’s lot must not fall greater than one meter across the building area, must be classified A or S class soil and not require or have at owner request any retaining on the site or steps through the home.
- The Client’s lot must be serviced by mains power, scheme water and sewerage.
- Area restrictions apply and vary between regions. Specific confirmation will be given to The Client on application. As a guide only:
o The metro region excluding the greater metro region as shown on the ‘where we build’ map. - The maximum total contract value of the building contract, including any variations to that contract, must not exceed $600,000.
- No variations whatsoever to the contract are permitted at any time after Ready to Start documents have been signed.
- All prestart colours and selections are to be made from The Builder’s standard ranges, unless expressly approved by The Builder.
- Any reselections required due to items or materials becoming obsolete or unavailable for a timeframe that would jeopardise this guarantee, The Client will be issued a variation to contract by The Builder, at The Builders absolute discretion. The Client will be required to accept, sign, and return these variations within 2 days of receipt of the variation.
- Make all progress payments within 10 days of issue of the progress claim.
- Meet all other contractual obligations in accordance with the building contract.
- This Guarantee is offered to new clients who sign their PPA on or after 20th of September 2024 and before 15th December 2024.
- The Builder reserves the right to amend or cancel this guarantee at any time without notice, prior to the signing of a building contract.
- Any breach of these T&Cs, as reasonably determined at the sole discretion of The Builder, will result in voiding this Build Time Guarantee.
- If this guarantee becomes void, the term and conditions of the building contract will prevail.
- All days noted in these T&Cs are working days.
- Practical Completion is defined as per the building contract.
- Any changes by governing or government bodies that cause direct or indirect delays to The Builder’s timeframes, including but not limited to COVID lockdown or isolation mandates, may void this guarantee at The Builder’s sole discretion.
- Should all the T&Cs be met, and The Builder does not meet the guaranteed Build Time date, payment will be calculated and made within 14 days of actual Practical Completion and The Builder having received notification of the clients nominated bank account details, whichever is the later. The payment will be a single lump sum to the clients nominated bank account. Any payments due under this clause, may not be set off against any payments due to The Builder by The Client.
- Should the delays extend past the 16 weeks, the term and conditions of building contract liquidated damages clause shall apply.
The Express Series – Price Hold Guarantee
Our Price Hold Guarantee offers you peace of mind knowing WA Country Builders (‘The Builder’) will guarantee your quoted price will be fixed from acceptance of your Preparation of Plans Agreement (PPA) to the completion of your home, subject to the following terms and conditions being met.
- No owner supplied items or works are permitted as part of the building contract.
- Is only applicable to the standard home designs identified in The Builder’s Express Series Promotion. Changes to the standard designs are not permitted without explicit written approval by The Builder and noted on the quotation.
- The Client’s lot must not fall greater than one meter across the building area, must be classified A or S class soil and not require or have at owner request any retaining on the site or steps through the home.
- The Client’s lot must be serviced by mains power, scheme water and sewerage.
- Area restrictions apply and vary between regions. Specific confirmation will be given to The Client on application. As a guide only:
- Metro – The metro region excluding the greater metro region as shown on the ‘where we build’ map.
- South West – Within a five Km radius of Bunbury, Busselton and Dunsborough town centres
- Great Southern – Within the greater Albany town area.
- Geraldton – Within the greater Geraldton town area.
- The maximum total contract value of the building contract must not exceed $600,000.
- No structural variations (as deemed by The Builder) are permitted at any time after PPA documentation is accepted by The Builder.
- Not applicable where any council planning or any other approvals outside of a standard building permit are required without the express consent of The Builder. A developer’s approval is acceptable given, that application is approved within 15 days of the application being received by the developer.
- The building contract must be signed by The Client and returned to the builder within 10 days of being issued to The Client.
- No variations of any description are to be requested, drawn, or quoted prior to, or post the prestart meeting. All selections and upgrades are to be requested during the prestart meeting only.
- All prestart colours and selections are to be made from The Builder’s standard ranges, unless expressly approved by The Builder.
- The Client must be available to attend and complete to the Builder’s satisfaction a prestart meeting within 10 days of contract signing at a time and date nominated by The Builder.
- The client must provide all necessary information and documentation to enable The Builder to apply for, and be issued, a building permit under the Building Act 2011 within 45 days of contract signing. This includes, but is not limited to, proof of settlement of the land in The Client’s name.
- Unconditional finance approval is provided to The Builder within 45 days of the contract date.
- All prestart variations are to be signed by The Client within 2 days of being issued.
- Final ‘OK to Start’ documentation to be signed by The Client within 7 days of issue. Any corrections (as agreed by The Builder) to be signed by the client within 2 days of being issued.
- Meet all other PPA and contractual obligations in accordance with those agreements and contracts.
- In addition to these T&Cs, any other time delays incurred between the PPA and commencement of works on site that are not directly attributable to the fault of The Builder may, at The Builder’s discretion, void this agreement.
- This Guarantee is offered to new clients who sign their PPA on or after 20th of September 2024 and before 15th December 2024.
- The Builder reserves the right to amend or cancel this guarantee at any time without notice, prior to The Builders acceptance of a PPA.
- The Price Hold Guarantee is not applicable to items quoted as Provisional Sums, Prime Cost or Allowances. These costs will be fixed in accordance with the term of the building contract.
- Any breach of these T&Cs, as reasonably determined at the sole discretion of The Builder, will result in voiding this Price Hold Guarantee. The quoted price will be become subject to the terms and conditions in accordance with the signed PPA and/or building contract.
- While our best endeavours are made to ensure all necessary approvals required are identified and obtained, the builder takes no responsibility should any approvals be rejected, or further approvals required in addition to a standard building licence. This includes, but not limited to council planning approval or approvals that require neighbour’s consent. In all these cases the Price Hold Guarantee may become null and void.
- All days noted in these T&Cs are working days.
- Any changes by governing or government bodies that cause direct or indirect delays to The Builder’s timeframes, including but not limited to COVID lockdown or isolation mandates, may void this guarantee at The Builder’s sole discretion.